Thursday, December 08, 2005

12/8/2005

Things done today:
 
    1. Started filling 25m pool with main bypass.
    2. Bottom of pool covered by 5pm.
    3. Tried to start circulation pump, ran into trouble with a vacuum in the suction line.
    4. 50m blew a line to the heater out of the saddle, 50m pool not operational, will wait for word from Gary on progress of repair. Pool is scheduled to be drained on Monday.
    5. Worried about main drain being closed. 