Things done today:
- Started filling 25m pool with main bypass.
- Bottom of pool covered by 5pm.
- Tried to start circulation pump, ran into trouble with a vacuum in the suction line.
- 50m blew a line to the heater out of the saddle, 50m pool not operational, will wait for word from Gary on progress of repair. Pool is scheduled to be drained on Monday.
- Worried about main drain being closed.
1 comment:
Great Job MONEY!!!!!!!!!!!!!!
Post a Comment