Wednesday, November 30, 2005

Dive Pool - Started draining Monday at 1:30pm, Chemicals were checked prior to the start of draining CL 0.0, PH 7.6 Temp 68 degrees.  I am using 1 electric vacuum to drain the pool.
 
Activity Pool - Needs cleaning
 
50 Meter Pool - +500lbs of bicarb last night
 
Pump room - Put 500lbs of bicarb in Yellow Buckets, Room needs to be cleaned, Robotech missing cart.
 
Pool Tech Meetings - I worked on creating a pool tech meeting schedule.
 
I have started today switching over my task list and other items to my outlook e-mail program along with my schedule. 
 
I will update more tonight!

Saturday, November 19, 2005

SCAC

The swim meet is happening today. I have made sure there is a 3 foot
clearance around the pool deck. I have also got line for the canopy buckets
.

I added 200 lbs of bicarb to the Dive pool to raise alkalinity and raised
the PH in the 50 meter to 7.5 from 7.3.

This place is very busy and I think that it will be hard to keep everything
perfect.

I am planning on spending time on the expansion joint later today at SCP.

SCP Expansion Joint

The pool expansion joint project has been officially as of Friday turned
over to me. Yesterday I went and picked up P/G Primer in Pomona from the
W.R. Meadows warehouse. They gave me a catalog that will be helpful in
planning future projects.

Tuesday, November 15, 2005

North Oaks Pool

The pool was vandalized lightly this weekend. I have cleaned up most of
the trash around. I also put 1 Gal of Bleach in the pit, and 2 gallons
directly in the pool.

Santa Clarita Pool Expansion Joint

I attended a meeting today regarding the expansion joint at SCP. From
everything said we will have the chance to try our temporary patch the end
of next week.

I am still looking for P.G. primer!

Tuesday, November 08, 2005

SCAC - 50 Meter Pool Chlorine & Acid Vats

The SCAC pumps for the 50 meter have not been working right for a week.  I am planning on fixing this tonight and should have them up and running by tomorrow (Wednesday).
 
 

North Oaks Pool Draining Time

I started draining the pool Monday Night at 5pm. I continued draining until 9pm (4 hours). Then I cam in at 10 am on Tuesday and was completed draining by 7pm (9 hours)on Tuesday. It is projected to take two more hours to finish draining the pit to the proper level, Then 2 hours to clean the pit and get ready for refill.

Here it is broken down:

Hrs. Activity
13 Pool drain using main pump
02 Pit Draining
02 Clean Pit and remove protective basket from pump

17 Total drain service by Pool Techs (two days needed for project)