Wednesday, September 21, 2005
VMP
The pool stretch cover has been installed, many anchors are missing so the cover will not support properly. I will write a workorder to remedy the anchor issue.
Activity pool
The pool was left on manual last night and needed to be adjusted with 75lbs of soda Ash. The pool looks fine and is ready to go!! 9/21/2005
Chemical Delivery Schedule
The chemcial delivery schedule has been changed so that all the outside pools have delivery based upon us ordering. SCAC has delivery every Tuesday with 200lbs of bicarb every week.
Tuesday, September 20, 2005
Swimming Pool Technician
Chemical Delivery Notes:
I have changed the delivery orders for all pools. VGP, VMP, SCP, NOP, NHP to upon demand delivery. SCAC to weekly delivery for Chlorine and Acid, Bicarb 200lbs a week.
I can order chems on Friday for delivery on Tuesday.
Inter Valley Pool Supply is closed on Mondays.
I have changed the delivery orders for all pools. VGP, VMP, SCP, NOP, NHP to upon demand delivery. SCAC to weekly delivery for Chlorine and Acid, Bicarb 200lbs a week.
I can order chems on Friday for delivery on Tuesday.
Inter Valley Pool Supply is closed on Mondays.
Wednesday, September 07, 2005
NHP
- Hung bucket legend
- added 75lbs of calcium chloride
- changed buckets
- installed blue buckets
- installed gamma seal lids
- Refill line leaking (I will write workorder tomorrow)
- Talked to K. Hugger and she said that her pools would be checked by the managers until the end of the month.
- She also said they would move most of the stuff in the office but they could not move the fridge. I told her I would work on getting it moved.
VMP
- Replaced the bucket lids
- Installed blue buckets
- Hung bucket legend
- put three 3 inch chlorine tablets in backwash pit
SCP
- Pit drained
- Colored buckets installed
- Basket around pump shaft removed
- E-mail Doug regarding ants in office and wurrounding areas
- Chlorine gallons empty
- I am planning on Draining the pool tonight
- Wrote workorder on pump room door
- Wrote workorder on chlorine pump
Monday, September 05, 2005
Tuesday September 6th, 2005
Plan:
1. 7am arrive and arrange for truck to go in for service.
2. 8am arrive at VMP with 055
3. 1pm Go to staff meeting
4. 3pm off
Tasks needing completion:
-Order expansion joint material
-Order 32' poles
-Get Phenol Red for activity pool
-Create schedule for September
-Buy shoes
-Buy tools
-Call frame shop
-Install bucket lids
-Zip tie flags SCAC
-Work on handicap lift SCAC
-Drain activity pool
-Drain SCP
-Re-create chemical emergency kit
-Order Vacuum hoses SCAC
-Fix vacuum NOP
-Get waterslide washing material
-Order oxidation remover for slide and Wax
-Move uniforms
-Create workshop in storage bin
-Stencil chemical buckets outside pools
-Take blower and pressure washer in form engine repair
-Finish waterslide compliance manual work
-Order janitorial supplies
-Start work on maintenance manuals
1. 7am arrive and arrange for truck to go in for service.
2. 8am arrive at VMP with 055
3. 1pm Go to staff meeting
4. 3pm off
Tasks needing completion:
-Order expansion joint material
-Order 32' poles
-Get Phenol Red for activity pool
-Create schedule for September
-Buy shoes
-Buy tools
-Call frame shop
-Install bucket lids
-Zip tie flags SCAC
-Work on handicap lift SCAC
-Drain activity pool
-Drain SCP
-Re-create chemical emergency kit
-Order Vacuum hoses SCAC
-Fix vacuum NOP
-Get waterslide washing material
-Order oxidation remover for slide and Wax
-Move uniforms
-Create workshop in storage bin
-Stencil chemical buckets outside pools
-Take blower and pressure washer in form engine repair
-Finish waterslide compliance manual work
-Order janitorial supplies
-Start work on maintenance manuals